Torborg house in Orlando - Construction Feb 12 to July 09
|
|
|
|
July 09, 2003 09july_img_7702.jpg
GREEN! They fixed it quickly enough. This is good. The color you see is the color
we asked for. This is much better to us than the yellow that we did NOT request. See
the construction history for the yellow color.
Click to enlarge
|
|
|
|
July 09, 2003 09july_img_7707.jpg
photo from the neighbor's driveway.
|
|
|
|
July 09, 2003 09july_img_7752.jpg
Looking into the dining room. The pocket door has wallboard around it now.
|
|
|
|
July 04, 2003 04july_img_7284_tn.jpg
AAAAAAH!!!! YUCK. They painted the house YELLOW! AAAAH!! YUCK
Click to enlarge
|
|
|
July 04, 2003 04july_img_7266.jpg
YELLOW YELLOW YELLOW YELLOW YUCK YUCK
|
|
|
July 04, 2003 04july_img_7264.jpg
They have put bifold doors for most closets. We'll have to replace these
when we get time and money. Asking the builder to do it was just to expensive.
|
|
|
July 04, 2003 04july_img_7269.jpg
These are the kitchen pantry doors.
|
|
|
July 04, 2003 04july_img_7282.jpg
This is a damaged wallboard that they just put the trim right on top of.
I guess they'll fix this later? This picture is looking at the foyer side
of the balcony from Jack's room's door. The doorway in the center of the
picture is to the middle bedroom.
|
|
|
|
June 28, 2003 28june_img_7170.jpg
We have an issue. The window is not square to the door or the planet
|
|
|
|
June 28, 2003 28june_img_7168.jpg
We have another issue. The door frame inside the front door near the floor
is messed up.
|
|
|
|
June 26, 2003 26june_img_7128_tn.jpg
All the walls are up and spackled inside. Some sanding and finishing and doors
are needed.
Click to enlarge
|
|
|
June 26, 2003 26_june_img_7149.jpg
|
|
|
June 26, 2003 26june_img_7152.jpg
|
|
|
June 26, 2003 26june_img_7150.jpg
|
|
|
June 26, 2003 26june_img_7131.jpg
|
|
|
June 26, 2003 26june_img_7134.jpg
This is the pocket door between the dining room and kitchen.
|
|
|
|
June 26, 2003 26june_img_7144.jpg
This is the network wiring panel in the laundry room.
|
|
|
|
June 16, 2003 03june16_img_6964.jpg
This is the master bedroom. The slider is STILL not installed.
|
|
|
|
June 16, 2003 03june16_img_6944.jpg
This is a photo of our soon to be kitchen. Nancy was pretty happy to see
this progress. Suddenly it looks like a house!
|
|
|
June 14, 2003 03june14_img_6835.jpg
The outside of the house has been wrapped and primed. The inside now has
wall board on most walls. Some walls are held up because the sound insulation had not arrived yet.
Click to enlarge
|
|
|
|
June 09, 2003 03june09_img_6646.jpg
The outer wrap is beginning. The insulation on the inside of the outer walls is completed
and some of the attic insulation is in place.
Click to enlarge
|
|
|
|
June 07, 2003 03june07_img_6395.jpg
This photo is in the kitchen. They fixed the kitchen window (see construction
history) and have applied insulation to all of the exterior walls.
|
|
|
|
June 08, 2003 03june08_img_6534.jpg
Looking up into the attic you can see a start of some insulation.
|
|
|
|
May 21, 2003 2003_05_21_IMG_5502.jpg
At 8:30am in May the sun is on the front left of the house.
Just above the foyer window (above the front door) the roof is still missing
some tiles. We're still missing two sliders in the back. The electrical
wiring is almost done. All of the 110/220 and low voltage wires are installed
but the outlets still need to be wired in many cases.
Click to enlarge
|
|
|
|
May 21, 2003 2003_05_21_IMG_5598.jpg
The back of the house is in shade this May morning (8:30am).
Click to enlarge
|
|
|
|
May 21, 2003 2003_05_21_IMG_5686.jpg
Upstairs after plumbing, wiring and ductwork.
|
|
|
|
May 21, 2003 2003_05_21_IMG_5534.jpg
Here is the low voltage wiring coming over the wall
from the laundry room and heading upstairs. This photo is from the first floor foyer looking up.
|
|
|
|
May 17, 2003 2003_05_17_IMG_5464.jpg
The air conditioner duct work is done and
the electrical wiring (high and low voltage) is installed. None of the fixtures or
outlets are wired yet. The plumbing piping is done.
Click to enlarge
|
|
|
|
May 17, 2003 2003_05_17_IMG_5471.jpg
The front doors are on now. There is
a clearance problem on the bottom of the door. The living room window has been installed
but still needs trim. The kitchen window is on as of today as well.
Click to enlarge
|
|
|
|
May 10, 2003 2003_05_10_IMG_5300.jpg
This image shows the back
woodwork done but we're still missign two sliders and the kitchen window.
Click to enlarge
|
|
|
|
|
|
April 23, 2003 2003_04_23_IMG_4853.jpg
This is the pedstal where the
two air conditioner units (inside) will be placed.
|
|
|
|
April 23, 2003 2003_04_23_IMG_4852.jpg
The attic is a maze of ductwork.
|
|
|
|
|
|
Apr 12, 2003 work_inprog_apr_12 We have windows. The roof tiling has started. Interior structural work is done.
The interior plumbing work has started.
Click to enlarge
|
|
|
|
Apr 12, 2003
work_inprog_apr_12_b
|
|
|
|
Apr 12, 2003
work_inprog_apr_12_c2
|
|
|
|
Apr 12, 2003
work_inprog_apr_12_c
|
|
|
|
Apr 12, 2003
work_inprog_apr_12_e
|
|
|
|
Apr 12, 2003
work_inprog_apr_12_f
|
|
|
|
Apr 12, 2003
work_inprog_apr_12_g
|
|
|
|
Apr 14, 2003
work_inprog_apr_14
|
|
|
|
Apr 14, 2003
work_inprog_apr_14_b
|
|
|
|
Apr 14, 2003
work_inprog_apr_14_c
|
|
|
|
Mar 28, 2003 Friday
work_inprog_mar_28_b
|
|
|
|
Mar 28, 2003 Friday
work_inprog_mar_28_c
|
|
|
|
Mar 28, 2003 Friday
work_inprog_mar_28_a
|
|
|
|
Mar 25, 2003 Tuesday
work_inprog_mar25
|
|
|
|
Mar 24, 2003 Monday - garage roof done, main roof started
work_inprog_mar_24_c
|
|
|
|
Mar 24, 2003 Monday - garage roof done, main roof started
work_inprog_mar_24
|
|
|
|
Mar 24, 2003 Monday - garage roof done, main roof started
work_inprog_mar24_b
|
|
|
|
Mar 22, 2003 Saturday - garage roof in progress
work_inprog_mar_22_d
|
|
|
|
Mar 22, 2003 Saturday
work_inprog_mar_22_c
|
|
|
|
Mar 22, 2003 Saturday
work_inprog_mar_22_b
|
|
|
|
Mar 22, 2003 Saturday
work_inprog_mar_22_a
|
|
|
|
Mar 21, 2003 Friday
work_inprog_mar_21_d.jpg
|
|
|
|
Mar 21, 2003 Friday
work_inprog_mar_21_c.jpg
|
|
|
|
Mar 21, 2003 Friday
work_inprog_mar_21_a.jpg
|
|
|
|
Mar 21, 2003 Friday
work_inprog_mar_21_b
|
|
|
|
Mar 19, 2003 Wednesday - start 2nd floor
work_inprog_mar_19_b.jpg
|
|
|
|
Mar 19, 2003 Wednesday - start 2nd floor
work_inprog_mar_19_a.jpg
|
|
|
|
Mar 19, 2003 Wednesday - start 2nd floor
work_inprog_mar_19_c.jpg
interesting modular construction
|
|
|
|
Mar 15, 2003 Saturday - more framing
mar_15_2860.jpg
|
|
|
|
Mar 13, 2003 On Thursday some first floor framing had been done.
work_inprog_2775.jpg
|
|
|
|
Mar 13, 2003 work_inprog_2801.jpg
Looking toward the guest room from the dining room
|
|
|
|
Mar 13, 2003 work_inprog_2800.jpg
Also from the dining room showing the front windows.
|
|
|
|
Mar 13, 2003 work_inprog_2796.jpg
from the foyer looking toward the dining room
|
|
|
|
Mar 13, 2003 This is looking toward the laundry room and the front of the garage work_inprog_2792.jpg
|
|
|
|
Mar 13, 2003
Apparently some of the wood for the roof and 2nd floor is in the piles around the house
work_inprog_2790.jpg
|
|
|
|
Mar 13, 2003 work_inprog_2787.jpg
|
|
|
|
Mar 13, 2003 work_inprog_2781z.jpg
These guys are doing pretty good work.
|
|
|
|
Mar 05, 2003 On Wednesday the cinder block work was completed.
|
|
|
|
Mar 5, 2003 work_inprog_mar_05.jpg
Panorama through the guest room window.
|
|
|
|
Mar 05, 2003 mar_05_img_2686
|
|
|
|
Mar 05, 2003 mar_05_img_2708
|
|
|
|
Mar 03, 2003 On Monday they had some of the garage wall cinder blocks put up
|
|
|
|
Feb 28, 2003 On Friday the cement pad had been poured and cinder blocks delivered. You can
see the tie rods poking through the cement. I'm standing in the back left corner of the house
and you can see the patio off to the left.
|
|
|
|
Feb 28, 2003 This photo is from front left looking toward the back of the garage.
The body of the house is recessed four feet from the garage and you can see that part of the house
on the left in this photo.
|
|
|
|
Feb 28, 2003 This is taken from the garage looking toward the front door.
You can see the front patio which as seen in earlier photos will have a roof and a
pair of pillars toward the right. The front door is at a 45 degree angle in the middle
of the photo.
|
|
|
|
Feb 12, 2003 This photo is of the 15th fairway from the other side of our lot. You can see people
putting. You can also see houses across the main street at the other end of the fairway.
See the satellite image above. Click for larger image.
|
|
|
|
Feb 12, 2003 This shows what my neighbors will look like. The density of
housing is pretty high. The first neighbor whose
house is not roofed yet in this photo is actually closer
than this makes it look. This is in wide angle.
|
|
|
|
On Feb 12, 2003 the forms have been placed to pour the foundation. I don't know how long it will
be before the foundation is actually poured. Here you can see how short the back yard is. The woods
starts 27' beyond the patio/balcony.
|
|
|
|
Feb 12, 2003 I took this photo from south of the house, right on
the property line between lots 56 and 57. The house
under construction on lot 56 is actually 5 feet from
the property line (highlighted in red.)
|
|
|
|
Feb 12, 2003 This photo is along the north property line. Our house will be 5 feet set back
from the property line. Some of the dirt
on this side of the 'silt' fence is actually part of the golf course.
|
|
|
|
|