Torborg house in Orlando - Construction Feb 12 to July 09


July 09, 2003
09july_img_7702.jpg
GREEN! They fixed it quickly enough. This is good. The color you see is the color we asked for. This is much better to us than the yellow that we did NOT request. See the construction history for the yellow color.
Click to enlarge

July 09, 2003
09july_img_7707.jpg
photo from the neighbor's driveway.

July 09, 2003
09july_img_7752.jpg
Looking into the dining room. The pocket door has wallboard around it now.

July 04, 2003
04july_img_7284_tn.jpg
AAAAAAH!!!! YUCK. They painted the house YELLOW! AAAAH!! YUCK
Click to enlarge
July 04, 2003
04july_img_7266.jpg
YELLOW YELLOW YELLOW YELLOW YUCK YUCK
July 04, 2003
04july_img_7264.jpg
They have put bifold doors for most closets. We'll have to replace these when we get time and money. Asking the builder to do it was just to expensive.
July 04, 2003
04july_img_7269.jpg
These are the kitchen pantry doors.
July 04, 2003
04july_img_7282.jpg
This is a damaged wallboard that they just put the trim right on top of. I guess they'll fix this later? This picture is looking at the foyer side of the balcony from Jack's room's door. The doorway in the center of the picture is to the middle bedroom.

June 28, 2003
28june_img_7170.jpg
We have an issue. The window is not square to the door or the planet

June 28, 2003
28june_img_7168.jpg
We have another issue. The door frame inside the front door near the floor is messed up.

June 26, 2003
26june_img_7128_tn.jpg
All the walls are up and spackled inside. Some sanding and finishing and doors are needed.
Click to enlarge
June 26, 2003
26_june_img_7149.jpg
June 26, 2003
26june_img_7152.jpg
June 26, 2003
26june_img_7150.jpg
June 26, 2003
26june_img_7131.jpg
June 26, 2003
26june_img_7134.jpg
This is the pocket door between the dining room and kitchen.

June 26, 2003
26june_img_7144.jpg
This is the network wiring panel in the laundry room.

June 16, 2003
03june16_img_6964.jpg
This is the master bedroom. The slider is STILL not installed.

June 16, 2003
03june16_img_6944.jpg
This is a photo of our soon to be kitchen. Nancy was pretty happy to see this progress. Suddenly it looks like a house!
June 14, 2003
03june14_img_6835.jpg
The outside of the house has been wrapped and primed. The inside now has wall board on most walls. Some walls are held up because the sound insulation had not arrived yet.
Click to enlarge

June 09, 2003
03june09_img_6646.jpg
The outer wrap is beginning. The insulation on the inside of the outer walls is completed and some of the attic insulation is in place.
Click to enlarge

June 07, 2003
03june07_img_6395.jpg
This photo is in the kitchen. They fixed the kitchen window (see construction history) and have applied insulation to all of the exterior walls.

June 08, 2003
03june08_img_6534.jpg
Looking up into the attic you can see a start of some insulation.

May 21, 2003
2003_05_21_IMG_5502.jpg
At 8:30am in May the sun is on the front left of the house.
Just above the foyer window (above the front door) the roof is still missing some tiles.
We're still missing two sliders in the back.
The electrical wiring is almost done. All of the 110/220 and low voltage wires are installed but the outlets still need to be wired in many cases.
Click to enlarge

May 21, 2003
2003_05_21_IMG_5598.jpg
The back of the house is in shade this May morning (8:30am).
Click to enlarge

May 21, 2003
2003_05_21_IMG_5686.jpg
Upstairs after plumbing, wiring and ductwork.

May 21, 2003
2003_05_21_IMG_5534.jpg
Here is the low voltage wiring coming over the wall from the laundry room and heading upstairs. This photo is from the first floor foyer looking up.

May 17, 2003
2003_05_17_IMG_5464.jpg
The air conditioner duct work is done and the electrical wiring (high and low voltage) is installed. None of the fixtures or outlets are wired yet. The plumbing piping is done.
Click to enlarge

May 17, 2003
2003_05_17_IMG_5471.jpg
The front doors are on now. There is a clearance problem on the bottom of the door. The living room window has been installed but still needs trim. The kitchen window is on as of today as well.
Click to enlarge

May 10, 2003
2003_05_10_IMG_5300.jpg
This image shows the back woodwork done but we're still missign two sliders and the kitchen window.
Click to enlarge

3 weeks

April 23, 2003
2003_04_23_IMG_4853.jpg
This is the pedstal where the two air conditioner units (inside) will be placed.

April 23, 2003
2003_04_23_IMG_4852.jpg
The attic is a maze of ductwork.

2 weeks

Apr 12, 2003
work_inprog_apr_12
We have windows. The roof tiling has started. Interior structural work is done. The interior plumbing work has started.
Click to enlarge

Apr 12, 2003
work_inprog_apr_12_b

Apr 12, 2003
work_inprog_apr_12_c2

Apr 12, 2003
work_inprog_apr_12_c

Apr 12, 2003
work_inprog_apr_12_e

Apr 12, 2003
work_inprog_apr_12_f

Apr 12, 2003
work_inprog_apr_12_g

Apr 14, 2003
work_inprog_apr_14

Apr 14, 2003
work_inprog_apr_14_b

Apr 14, 2003
work_inprog_apr_14_c

Mar 28, 2003
Friday
work_inprog_mar_28_b

Mar 28, 2003
Friday
work_inprog_mar_28_c

Mar 28, 2003
Friday
work_inprog_mar_28_a

Mar 25, 2003
Tuesday
work_inprog_mar25

Mar 24, 2003
Monday - garage roof done, main roof started
work_inprog_mar_24_c

Mar 24, 2003
Monday - garage roof done, main roof started
work_inprog_mar_24

Mar 24, 2003
Monday - garage roof done, main roof started
work_inprog_mar24_b

Mar 22, 2003
Saturday - garage roof in progress
work_inprog_mar_22_d

Mar 22, 2003
Saturday
work_inprog_mar_22_c

Mar 22, 2003
Saturday
work_inprog_mar_22_b

Mar 22, 2003
Saturday
work_inprog_mar_22_a

Mar 21, 2003
Friday
work_inprog_mar_21_d.jpg

Mar 21, 2003
Friday
work_inprog_mar_21_c.jpg

Mar 21, 2003
Friday
work_inprog_mar_21_a.jpg

Mar 21, 2003
Friday
work_inprog_mar_21_b

Mar 19, 2003
Wednesday - start 2nd floor
work_inprog_mar_19_b.jpg

Mar 19, 2003
Wednesday - start 2nd floor
work_inprog_mar_19_a.jpg

Mar 19, 2003
Wednesday - start 2nd floor
work_inprog_mar_19_c.jpg
interesting modular construction

Mar 15, 2003
Saturday - more framing
mar_15_2860.jpg
march 15

Mar 13, 2003
On Thursday some first floor framing had been done.
work_inprog_2775.jpg

Mar 13, 2003
work_inprog_2801.jpg
Looking toward the guest room from the dining room
march 13

Mar 13, 2003
work_inprog_2800.jpg
Also from the dining room showing the front windows.

Mar 13, 2003
work_inprog_2796.jpg
from the foyer looking toward the dining room

Mar 13, 2003
This is looking toward the laundry room and the front of the garage
work_inprog_2792.jpg

Mar 13, 2003
Apparently some of the wood for the roof and 2nd floor is in the piles around the house
work_inprog_2790.jpg

Mar 13, 2003
work_inprog_2787.jpg

Mar 13, 2003
work_inprog_2781z.jpg
These guys are doing pretty good work.

Mar 05, 2003
On Wednesday the cinder block work was completed.

Mar 5, 2003
work_inprog_mar_05.jpg
Panorama through the guest room window.
inside from guest room window

Mar 05, 2003
mar_05_img_2686

Mar 05, 2003
mar_05_img_2708

Mar 03, 2003
On Monday they had some of the garage wall cinder blocks put up

Feb 28, 2003
On Friday the cement pad had been poured and cinder blocks delivered. You can see the tie rods poking through the cement. I'm standing in the back left corner of the house and you can see the patio off to the left.

Feb 28, 2003
This photo is from front left looking toward the back of the garage.
The body of the house is recessed four feet from the garage and you can see that part of the house on the left in this photo.

Feb 28, 2003
This is taken from the garage looking toward the front door. You can see the front patio which as seen in earlier photos will have a roof and a pair of pillars toward the right. The front door is at a 45 degree angle in the middle of the photo.

Feb 12, 2003
This photo is of the 15th fairway from the other side of our lot. You can see people putting. You can also see houses across the main street at the other end of the fairway. See the satellite image above. Click for larger image.
fairway from lot 56

Feb 12, 2003
This shows what my neighbors will look like. The density of housing is pretty high. The first neighbor whose house is not roofed yet in this photo is actually closer than this makes it look. This is in wide angle.
pana from corner of our lot

On Feb 12, 2003 the forms have been placed to pour the foundation. I don't know how long it will be before the foundation is actually poured. Here you can see how short the back yard is. The woods starts 27' beyond the patio/balcony.
form for pouring the foundation

Feb 12, 2003
I took this photo from south of the house, right on the property line between lots 56 and 57. The house under construction on lot 56 is actually 5 feet from the property line (highlighted in red.)
property line between 57 and 56

Feb 12, 2003
This photo is along the north property line. Our house will be 5 feet set back from the property line. Some of the dirt on this side of the 'silt' fence is actually part of the golf course.
property line between golf course and 57